Digitalni repozitorij raziskovalnih organizacij Slovenije

Iskanje po repozitoriju
A+ | A- | Pomoč | SLO | ENG

Iskalni niz: išči po
išči po
išči po
išči po

Možnosti:
  Ponastavi


Iskalni niz: "ključne besede" (concrete dams) .

1 - 2 / 2
Na začetekNa prejšnjo stran1Na naslednjo stranNa konec
1.
Behaviour of the backfilled right bank of the Mavčiče dam
Pavel Žvanut, Rude Brinšek, 2018, objavljeni znanstveni prispevek na konferenci

Povzetek: The Mavčiče concrete gravity dam, part of the corresponding hydro-power plant, was built on the Sava River, in Slovenia, in 1986. It has a maximum structural height of 38.5 m, and the dam crest has a length of 149 m. The dam structure consists of an erection bay, a machine hall, and two spillways, followed by an embankment dam. Most of the dam is founded on permeable Quaternary conglomerate bedrock, so that a cut-off grout curtain had to be constructed to a depth of up to 60 m below the ground surface, where a layer of impermeable Oligocene marine clay occurs. However, the erection bay, which is located on the right bank of the dam, is founded on a layer of gravel backfill, up to about 25 m thick, which lies on top of the conglomerate bedrock. Long-term manual technical monitoring of the behaviour of the dam began in 1986, and an automated monitoring system was established between 2003 and 2005. In general, the results of measurements and visual inspections did not show any abnormalities. However, this was not the case for the erection bay located on the top of the backfilled right bank of the dam, where the results of measurements of vertical displacements showed increasing settlements. By 1999, i.e. over a period of 12 years, these settlements had increased to 22 mm. The results of investigations, by drilling three research boreholes in 1993, and another six such boreholes in 1996, indicated that the settlements were the consequence of the secondary consolidation of the backfill, and probable also due to scouring of fine material from the backfill. Due to the resulting differential settlements, the crane rail which connects the erection bay to the machine hall, as well as the crane rail which is located along the crest of the dam, became nonfunctional, and needed height corrections. For this reason rehabilitation works of the backfill and of the substratum of the right bank of the dam were performed between September 1999 and August 2000, using 50 m long grouted boreholes. This grouting was performed using a combination of water reactive polyurethane and a cement-bentonite mixture. Measurements performed since than have shown that the settlement rate has slowed down slightly (by 2017, i.e. over the last 17 years, the settlements had increased by up to 8 mm), but from the point of view of the operation of the two crane rails the settlement process needed to be stopped. Additional investigations, involving the drilling of two research boreholes, as well as appropriate laboratory and field measurements, were performed between November 2015 and March 2016. According to the results of these most recent investigations, the newer settlements were the consequence of additional scouring of fine material from the backfill. In order to achieve a final solution to the problem of the subsidence of the erection bay, additional rehabilitation works of the backfill and substratum of the right bank of the dam, by grouting the permeable zones, would be needed in order to stop both the scouring of fine material from the backfill, as well as any internal erosion of the cavernous conglomerate at the base of the backfill. The latter concerns the long-term stability of the right bank of the dam with potentially serious results.
Ključne besede: concrete dams, gravity dams, Mavčiče Dam, Sava River, technical monitoring, geotechnical investigation, rehabilitation
Objavljeno v DiRROS: 05.04.2024; Ogledov: 64; Prenosov: 36
.pdf Celotno besedilo (1,34 MB)
Gradivo ima več datotek! Več...

2.
Surveillance of the banks of reservoirs on the Drava River in Slovenia after extensive floods
Pavel Žvanut, 2022, objavljeni znanstveni prispevek na konferenci

Povzetek: The Slovenian section of the Drava River is 133 km long, and over this distance it has a descent of 148 m. Eight HPPs are located on this section (six directly in the river course, whereas the other two in derivation channels of the river). Ten concrete gravity dams, with a structural height between 17 and 54 m, created eight reservoirs. In addition to their main use for electricity generation, reservoirs are also used for floods mitigation, irrigation, industrial water use and recreation. At the beginning of November 2012, extremely high flows of the Drava River, which exceeded 100-year flood, caused floods in the middle and lower reaches of the river. Extraordinary visual geotechnical inspections of the banks, in order to determine any instability of them, were carried out immediately after this event. Numerous landslides and landslips were identified, as well as damage to nearby buildings, but also damage and threat to transport infrastructure. Damaged banks of reservoirs and damaged infrastructure were instantly rehabilitated. In the future, it is necessary to perform regular and extraordinary surveillance of the banks of reservoirs, drawing attention to damage that needs immediate rehabilitation, thus preventing the occurrence of eventual disastrous consequences.
Ključne besede: concrete dams, Drava river, reservoirs, derivation channels, extreme events, extensive floods, extraordinary visual inspection, Formin HPP, levee breach, great damage
Objavljeno v DiRROS: 06.02.2024; Ogledov: 150; Prenosov: 61
.pdf Celotno besedilo (18,69 MB)
Gradivo ima več datotek! Več...

Iskanje izvedeno v 0.05 sek.
Na vrh