Digitalni repozitorij raziskovalnih organizacij Slovenije

Izpis gradiva
A+ | A- | Pomoč | SLO | ENG

Naslov:Replacement strategy of the EU-DEMO and CFETR breeding blanket pipes
Avtorji:ID Mozzillo, Rocco (Avtor)
ID Bachmann, Christian (Avtor)
ID Janeschitz, Günter (Avtor)
ID Claps, Vincenzo (Avtor)
ID Costa Garrido, Oriol, Institut "Jožef Stefan" (Avtor)
ID Hongtao, Pan (Avtor)
ID Li, Fei (Avtor)
ID Sorgente, Donato (Avtor)
Datoteke:URL URL - Izvorni URL, za dostop obiščite https://www.sciencedirect.com/science/article/pii/S0920379624001649
 
.pdf PDF - Predstavitvena datoteka, prenos (4,78 MB)
MD5: D3AE2ADF0A568786CFA4FC4516A503BD
 
Jezik:Angleški jezik
Tipologija:1.01 - Izvirni znanstveni članek
Organizacija:Logo IJS - Institut Jožef Stefan
Povzetek:Both EU-DEMO and CFETR need a workable replacement scheme for their tritium breeding blanket (BB). The radioactive environment dictates that all associated operations must be carried out through remotely controlled tools. Accessing and extracting the large BB segments requires their feeding pipes to be removed first from the upper vessel port and later re-installed. In the current design, each of the 80 BB segments is connected with four feeding pipes, two for cooling and two for tritium extraction. Thus, in the process of BB maintenance operation, 320 pipes must be cut, removed and rewelded. The developed concept for this task is presented here. It aims at reducing the associated plant downtime, thereby increasing the overall plant availability. Features underpinning this integrated BB pipe service concept are: (i) parallel pipe service operations, (ii) pipes in each upper port are grouped in a pipe forest and handled as a single component, (iii) the configuration of the individual pipes is standardized such that cutting and joining locations are aligned and with good accessibility from the top, (iv) the number of pipe sizes is limited to two, reducing the number of required tool sets, and (v) the same pipe configuration is adopted in each of the 16 upper ports. The paper will present design solutions and the progress on the manufacturing of prototypes developed for the challenging cutting and welding tasks from both within and outside, as well as the leak detection methodology and pipe stub handling. Prototypes will be used to perform design validation and verification on dedicated test benches currently being implemented in close collaboration between European laboratories and the Comprehensive Research fAcility for Fusion Technology (CRAFT) at ASIPP in China.
Ključne besede:fusion, test reactors, remote maintenance, breeding blanket, feeding pipes
Status publikacije:Objavljeno
Verzija publikacije:Objavljena publikacija
Poslano v recenzijo:20.10.2023
Datum sprejetja članka:04.03.2024
Datum objave:16.03.2024
Založnik:Elsevier
Leto izida:2024
Št. strani:str. 1-7
Številčenje:Vol. 202, [article no.] 114311
Izvor:Nizozemska
PID:20.500.12556/DiRROS-21783 Novo okno
UDK:53
ISSN pri članku:1873-7196
DOI:10.1016/j.fusengdes.2024.114311 Novo okno
COBISS.SI-ID:189646083 Novo okno
Avtorske pravice:© 2024 The Authors.
Opomba:Nasl. z nasl. zaslona; Opis vira z dne 20. 3. 2024;
Datum objave v DiRROS:28.03.2025
Število ogledov:531
Število prenosov:271
Metapodatki:XML DC-XML DC-RDF
:
Kopiraj citat
  
Objavi na:Bookmark and Share


Postavite miškin kazalec na naslov za izpis povzetka. Klik na naslov izpiše podrobnosti ali sproži prenos.

Gradivo je del revije

Naslov:Fusion engineering and design
Založnik:Elsevier
COBISS.SI-ID:23146245 Novo okno

Gradivo je financirano iz projekta

Financer:EC - European Commission
Program financ.:HE
Številka projekta:101052200
Naslov:Implementation of activities described in the Roadmap to Fusion during Horizon Europe through a joint programme of the members of the EUROfusion consortium
Akronim:EUROfusion

Licence

Licenca:CC BY 4.0, Creative Commons Priznanje avtorstva 4.0 Mednarodna
Povezava:http://creativecommons.org/licenses/by/4.0/deed.sl
Opis:To je standardna licenca Creative Commons, ki daje uporabnikom največ možnosti za nadaljnjo uporabo dela, pri čemer morajo navesti avtorja.
Začetek licenciranja:16.03.2024
Vezano na:VoR

Sekundarni jezik

Jezik:Slovenski jezik
Ključne besede:fuzija, testni reaktorji


Nazaj