Digitalni repozitorij raziskovalnih organizacij Slovenije

Iskanje po repozitoriju
A+ | A- | Pomoč | SLO | ENG

Iskalni niz: išči po
išči po
išči po
išči po

Možnosti:
  Ponastavi


Iskalni niz: "ključne besede" (viaduct) .

1 - 2 / 2
Na začetekNa prejšnjo stran1Na naslednjo stranNa konec
1.
Comprehensive permanent remote monitoring system of a multi-span highway bridge
Andrej Anžlin, Uroš Bohinc, Doron Hekič, Maja Kreslin, Jan Kalin, Aleš Žnidarič, 2021, objavljeni znanstveni prispevek na konferenci

Povzetek: As part of the reconstruction of a multi-span viaduct on a Slovenian highway, a permanent remote monitoring system with over 200 sensors was established. Several parameters are monitored on different parts of the viaduct by means of temperature sensors, accelerometers, strain gauges, long-gauge deformation and Fibre Bragg Grating (FBG) sensors. In this way strains, frequencies and temperatures on external prestressed beam cables, carbon fibre rebarsused for the flexural strengthening of a deck overhang, pier caps and prestressed beams are measured and stored into the on-site central data acquisition system. This paper presents architecture of the permanent bridge monitoring system and preliminary results of the measurements.
Ključne besede: permanent monitoring, structural health monitoring, bridge WIM, sensors, viaduct
Objavljeno v DiRROS: 22.01.2024; Ogledov: 272; Prenosov: 123
.pdf Celotno besedilo (9,29 MB)
Gradivo ima več datotek! Več...

2.
Model updating concept using bridge Weigh-in-Motion data
Doron Hekič, Andrej Anžlin, Maja Kreslin, Aleš Žnidarič, Peter Češarek, 2023, izvirni znanstveni članek

Povzetek: Finite element (FE) model updating of bridges is based on the measured modal parameters and less frequently on the measured structural response under a known load. Until recently, the FE model updating did not consider strain measurements from sensors installed for weighing vehicles with bridge weigh-in-motion (B-WIM) systems. A 50-year-old multi-span concrete highway viaduct, renovated between 2017 and 2019, was equipped with continuous monitoring system with over 200 sensors, and a B-WIM system. In the most heavily instrumented span, the maximum measured longitudinal strains induced by the full-speed calibration vehicle passages were compared with the modelled strains. Based on the sensitivity study results, three variables that affected its overall stiffness were updated: Young’s modulus adjustment factor of all structural elements, and two anchorage reduction factors that considered the interaction between the superstructure and non-structural elements. The analysis confirmed the importance of the initial manual FE model updating to correctly reflect the non-structural elements during the automatic nonlinear optimisation. It also demonstrated a successful use of pseudo-static B-WIM loading data during the model updating process and the potential to extend the proposed approach to using random B-WIM-weighed vehicles for FE model updating and long-term monitoring of structural parameters and load-dependent phenomena.
Ključne besede: monitoring, bridge, viaduct, bridge weigh-in-motion (B-WIM), structural health monitoring (SHM), finite element (FE), calibration, model updating
Objavljeno v DiRROS: 29.05.2023; Ogledov: 422; Prenosov: 227
.pdf Celotno besedilo (26,28 MB)
Gradivo ima več datotek! Več...

Iskanje izvedeno v 0.1 sek.
Na vrh