Digital repository of Slovenian research organisations

Search the repository
A+ | A- | Help | SLO | ENG

Query: search in
search in
search in
search in

Options:
  Reset


Query: "work type" (1) AND "fulltext" .

Search without a query returns a maximum of 500 hits!

221 - 230 / 500
First pagePrevious page19202122232425262728Next pageLast page
221.
Clustering and blockmodeling temporal networks - two indirect approaches
Vladimir Batagelj, 2023, published scientific conference contribution

Abstract: Two approaches to clustering and blockmodeling of temporal networks are presented: the first is based on an adaptation of the clustering of symbolic data described by modal values and the second is based on clustering with relational constraints. Different options for describing a temporal block model are discussed.
Keywords: social networks, network analysis, blockmodeling, symbolic data analysis, clustering with relational constraints
Published in DiRROS: 08.04.2024; Views: 92; Downloads: 47
.pdf Full text (461,70 KB)
This document has many files! More...

222.
Behaviour of the backfilled right bank of the Mavčiče dam
Pavel Žvanut, Rude Brinšek, 2018, published scientific conference contribution

Abstract: The Mavčiče concrete gravity dam, part of the corresponding hydro-power plant, was built on the Sava River, in Slovenia, in 1986. It has a maximum structural height of 38.5 m, and the dam crest has a length of 149 m. The dam structure consists of an erection bay, a machine hall, and two spillways, followed by an embankment dam. Most of the dam is founded on permeable Quaternary conglomerate bedrock, so that a cut-off grout curtain had to be constructed to a depth of up to 60 m below the ground surface, where a layer of impermeable Oligocene marine clay occurs. However, the erection bay, which is located on the right bank of the dam, is founded on a layer of gravel backfill, up to about 25 m thick, which lies on top of the conglomerate bedrock. Long-term manual technical monitoring of the behaviour of the dam began in 1986, and an automated monitoring system was established between 2003 and 2005. In general, the results of measurements and visual inspections did not show any abnormalities. However, this was not the case for the erection bay located on the top of the backfilled right bank of the dam, where the results of measurements of vertical displacements showed increasing settlements. By 1999, i.e. over a period of 12 years, these settlements had increased to 22 mm. The results of investigations, by drilling three research boreholes in 1993, and another six such boreholes in 1996, indicated that the settlements were the consequence of the secondary consolidation of the backfill, and probable also due to scouring of fine material from the backfill. Due to the resulting differential settlements, the crane rail which connects the erection bay to the machine hall, as well as the crane rail which is located along the crest of the dam, became nonfunctional, and needed height corrections. For this reason rehabilitation works of the backfill and of the substratum of the right bank of the dam were performed between September 1999 and August 2000, using 50 m long grouted boreholes. This grouting was performed using a combination of water reactive polyurethane and a cement-bentonite mixture. Measurements performed since than have shown that the settlement rate has slowed down slightly (by 2017, i.e. over the last 17 years, the settlements had increased by up to 8 mm), but from the point of view of the operation of the two crane rails the settlement process needed to be stopped. Additional investigations, involving the drilling of two research boreholes, as well as appropriate laboratory and field measurements, were performed between November 2015 and March 2016. According to the results of these most recent investigations, the newer settlements were the consequence of additional scouring of fine material from the backfill. In order to achieve a final solution to the problem of the subsidence of the erection bay, additional rehabilitation works of the backfill and substratum of the right bank of the dam, by grouting the permeable zones, would be needed in order to stop both the scouring of fine material from the backfill, as well as any internal erosion of the cavernous conglomerate at the base of the backfill. The latter concerns the long-term stability of the right bank of the dam with potentially serious results.
Keywords: concrete dams, gravity dams, Mavčiče Dam, Sava River, technical monitoring, geotechnical investigation, rehabilitation
Published in DiRROS: 05.04.2024; Views: 71; Downloads: 38
.pdf Full text (1,34 MB)
This document has many files! More...

223.
Life cycle assessment of metal alloys for structural applications
Katja Malovrh Rebec, Boštjan Markoli, Blaž Leskovar, 2018, published scientific conference contribution (invited lecture)

Abstract: The study compared environmental footprints of two types of Al-alloys: well-known 5083 aluminium alloy with magnesium and traces of manganese and chromium in its composition. This material is highly resistant to seawater corrosion and the influence of industrial chemicals. Furthermore, it retains exceptional strength after welding. The comparisons were made to an innovative alloy where the aluminium based matrix is reinforced by metastable quasicrystals (QC), thus avoiding magnesium in its composition. Furthermore, we checked other aluminium ingots' footprints and compared European average and Germany country specific production data. Environmental footprints were assessed via cradle to gate life cycle assessment. Our findings normalized to 1 m2 plate suggest, that newly proposed alloy could save around 50 % in value of parameters abiotic resources depletion of fossil fuels, acidification, eutrophication, global warming potential and photochemical ozone creation potential if we compare Qc5 to 6 mm 5083 alloy plate. Only abiotic resources depletion of elements and ozone depletion parameters increase for Qc5 compared to 6 mm 5083 alloy plate.
Keywords: environmental footprints, LCA, Al-alloys
Published in DiRROS: 05.04.2024; Views: 87; Downloads: 62
.pdf Full text (2,29 MB)
This document has many files! More...

224.
Improving uncertainty of strain gauge bridge standards
Miha Hiti, 2018, published scientific conference contribution

Abstract: The article proposes a procedure for calibration of strain gauge bridge standards with improved relative calibration uncertainty. In contrast to a typical calibration with voltage ratio standards or comparison calibration with other bridge standards, the proposed procedure uses a calibrated reference bridge amplifier, additionally evaluated using combinatorial calibration technique to improve its calibration uncertainty. The resulting uncertainty of ratio steps referenced to zero ratio step is lower than the traditional uncertainty achieved through direct independent traceability to mVV−1 ratio values. The proposed procedure enables direct application of the calibrated bridge standard values with low relative uncertainty for calibration of bridge amplifiers, without the need for additional combinatorial evaluation of each individual bridge amplifier.
Keywords: voltage ratio, linearity check, bridge standard, calibration
Published in DiRROS: 05.04.2024; Views: 66; Downloads: 51
.pdf Full text (775,45 KB)
This document has many files! More...

225.
The comparison of conventional and additive manufacturing technologies for manufacturing of Ti6Al4V structures in the aerospace industry
Marjetka Conradi, 2023, published scientific conference contribution abstract (invited lecture)

Published in DiRROS: 04.04.2024; Views: 90; Downloads: 41
.pdf Full text (71,68 KB)
This document has many files! More...

226.
Optimization of SLM and DED process parameters for the development of hybrid additive manufactured Ti6Al4V structures
Irena Paulin, 2023, published scientific conference contribution abstract (invited lecture)

Published in DiRROS: 04.04.2024; Views: 93; Downloads: 39
.pdf Full text (52,42 KB)
This document has many files! More...

227.
Optimization of heat treatment and surface post-processing in the development of hybrid additive manufactured Ti6Al4V structures
Simon Malej, 2023, published scientific conference contribution abstract (invited lecture)

Published in DiRROS: 04.04.2024; Views: 94; Downloads: 41
.pdf Full text (55,13 KB)
This document has many files! More...

228.
229.
Hybrid additive manufacturing approach for rapid manufacturing of larger parts with geometrically complex structures – recent trends in the aerospace engineering industry
Aleksandra Kocijan, 2023, published scientific conference contribution abstract (invited lecture)

Published in DiRROS: 04.04.2024; Views: 101; Downloads: 55
.pdf Full text (53,20 KB)
This document has many files! More...

230.
Semirigid thoracoscopy : an effective method for diagnosing pleural malignancies
Aleš Rozman, Luka Camlek, Izidor Kern, Mateja Marc-Malovrh, 2014, original scientific article

Keywords: torakoskopija, plevra, diagnostika
Published in DiRROS: 04.04.2024; Views: 97; Downloads: 28
.pdf Full text (277,83 KB)

Search done in 0.82 sec.
Back to top