Digital repository of Slovenian research organisations

Search the repository
A+ | A- | Help | SLO | ENG

Query: search in
search in
search in
search in

Options:
  Reset


Query: "keywords" (numerical model updating) .

1 - 1 / 1
First pagePrevious page1Next pageLast page
1.
Challenges of implementing bridge weigh-in-motion on a century-old steel-riveted railway bridge
Doron Hekič, Mirko Kosič, Jan Kalin, Aleš Žnidarič, Andrej Anžlin, 2024, published scientific conference contribution

Abstract: This study explores the challenges and methodologies involved in implementing bridge weigh-in-motion (B-WIM) system on a century-old steel riveted railway bridge. A unique aspect of this study, funded by the EU H2020 Shift2Rail Joint Undertaking, was the adaptation of B-WIM systems to the specific constraints of railway bridges since, traditionally, this technology is used to collect heavy gross vehicle loading data on road bridges. The paper details the experimental setup on an old steel-riveted railway bridge, including sensor placement and calibration processes. It highlights the complexities encountered, such as differences in bridge response due to passenger and other type of trains. It introduces the system calibration strategy using known axle loads from passenger locomotives. The study provides insights into the structural response of old steel bridges under traffic loads, contributing valuable data to the field of railway bridge monitoring and maintenance.
Keywords: bridge, B-WIM, bridge Weigh-in-Motion system, numerical model updating, bridge response measurements, railways
Published in DiRROS: 14.08.2024; Views: 1190; Downloads: 725
.pdf Full text (20,16 MB)
This document has many files! More...

Search done in 0.03 sec.
Back to top